The club's layouts
Hastings Tramways
This "00" gauge layout was built several years by the members of the Hastings tramways club. Its a two rail operation
layout based on the layout of the Hastings Tramways. It made its debut at the RVRSA Open Day in April 2006 after it was
recently rebuilt by some of our members. The layout has since been damaged and is awaiting repair.


Member's layouts
Rural Tramways
This "00" gauge layout was built by Oliver Boorman - Humphrey and his Dad, Alan, in February 2005. It is set in
a fictitious semi-rural small town with its own small
tramway. It works on two-rail operation using Gaugemaster controls. The layout has one main oval with three sidings including
a passing loop. The layout has a fully working traverser (used to move tramcars about the depot tracks without a fan
of points).

|